cover image: Madras Detailed Standard Specifications. for use in the Public Works Department of the Madras Presidency

Premium

20.500.12592/q09630

Madras Detailed Standard Specifications. for use in the Public Works Department of the Madras Presidency

1940

He (if appointed) shall in the absence of the Executive Engineer furnish the contractor with the Executive Engineer's or his representative's instructions and directions as to the progress and execution of the works and the contractor shall duly comply with such instructions and directions and shall on the written requisition of the maistri clerk of works or agent stay the further progress of [...] (c) On the occurrence of an accident which results in the death of any of the workmen employed by the contractor or which is so serious as to be likely to result in the death of any such workmen the contractor shall within 24 hours of the happening of such accident intimate in writing to the concerned Section Officer of the Public Works Department the fact of such accident The contractor shal [...] Ratification of the orders of the Executive Engineer.—Should the acceptance of the tender be beyond the authorized powers of the Executive Engineer as laid down in the Public Works Department Cs* the orders and decisions of such Executive Engineer with regard to extension of time for completing the contract or the termination of the contract or of the emploment of specialists for certain porti [...] If at any time the Executive Engineer shall be of the opinion that the contractor is delaying commencement of the work or violating any of the provisions of the contract or is neglecting or delaying the progress of the work as defined by the tabular statement Rate of Progress " in the " Articles of. [...] Upon the completion of the works the Executive Engineer shall certify the amount of the expenses properly incurred consequent on and incidental to the default of the contractor as aforesaid and in having the works completed by other persons having credited the contractor with the value of the materials utilized as aforesaid.
government politics public policy
Pages
457
Published in
India
SARF Document ID
sarf.145012
Segment Pages Author Actions
Frontmatter
i-xviii unknown view
Preliminary Specification
1-16 unknown view
Section 1 Materials
17-28 unknown view
Section 2 Clearing Site. Dismantling. Quarrying and Blasting
29-38 unknown view
Section 3 Earthwork—Repairing or Raising Tank-Bunds and River Flood Banks. Forming or Reforming Tank-Bunds or Closing Breaches. Forming Channel Banks. Silt Clearance—Channels and Drains Where Sectioned Spoil Bank is Required. Earthwork and Rough Banking. Puddle Work. Turfing. Excavating Foundations. Filling in Foundations. Filling in Basement. Well Sinking
39-52 unknown view
Section 4 Lime and Surki Concrete. Cement Concrete. Repair Grouting. Reinforced Concrete. Notes on Reinforced Concrete
53-80 unknown view
Section 5 Brick Masonry
81-92 unknown view
Section 6 Stone Masonry
93-114 unknown view
Section 7 Flooring
115-126 unknown view
Section 8 Roofing and Ceilings
127-146 unknown view
Section 9 Plastering. Pointing. Whitewashing. Colourwashing. Distempering
147-158 unknown view
Section 10 Painting. Varnishing Etc
159-170 unknown view
Section 11 Woodwork Doors Windows Ventilators
171-282 unknown view
Section 12 Miscellaneous
283-309 unknown view
Section 13 Road Work
310-319 unknown view
Section 14 Steel and Iron Work
320-333 unknown view
Section 15 River Conservancy (Sundry Items)
334-339 unknown view
Section 16 Sanitary Works and Roof Plumbing
340-381 unknown view
Appendices