213818
Madras Detailed Standard Specifications. for use in the Public Works Department of the Madras Presidency
>
Section 3 Earthwork—Repairing or Raising Tank-Bunds and River Flood Banks. Forming or Reforming Tank-Bunds or Closing Breaches. Forming Channel Banks. Silt Clearance—Channels and Drains Where Sectioned Spoil Bank is Required. Earthwork and Rough Banking. Puddle Work. Turfing. Excavating Foundations. Filling in Foundations. Filling in Basement. Well Sinking
Title | Section 3 Earthwork—Repairing or Raising Tank-Bunds and River Flood Banks. Forming or Reforming Tank-Bunds or Closing Breaches. Forming Channel Banks. Silt Clearance—Channels and Drains Where Sectioned Spoil Bank is Required. Earthwork and Rough Banking. Puddle Work. Turfing. Excavating Foundations. Filling in Foundations. Filling in Basement. Well Sinking |
Author / Editor | Printed by the Superintendent. Government Press |
Pages | 39 - 52 |
Related content