Military Works Handbook

1914

The circumstances leading up to the preparation of the estimate and the necessity for the work aro to be briefly stated. [...] The cost of the work the plinth area of the building and the plinth area rate will be given. [...] State the nature of the soil the depth to good soil the depth and width of the foundations and the material to be used. [...] pillars the positions of which are to be fixed by the Garrison Engineer are to be left at sufficient intervals to pemit accurate measurements to be taken on the completion of the work : such pillars are not to be demolished with'ut the orders of the Garrison Engineer. [...] 3. Before any blasting is carried out the orders of the Garrison Engineer are to be taken regarding the hours for firing charges the nature of the explosives to be used and the precautions that are to be taken for the safety of the general public.
government politics public policy
Pages
356
Published in
India
SARF Document ID
sarf.145924
Segment Pages Author Actions
Frontmatter
i-viii unknown view
Section I. Estimates
1-5 unknown view
Section II. General Specifications
6-13 unknown view
Section III. Detailed Specifications
14-67 unknown view
Section IV. Calculations
68-149 unknown view
Section V. Water-supply Roads and Drains
150-203 unknown view
Section VI. Contracts and Rates
204-257 unknown view
Section VII. Miscellaneous
258-284 unknown view
Index
285-294 unknown view
Backmatter
i-xlv unknown view