cover image: Report on the Proposed Indus Right Bank Canal Project with Abstract Estimates and Miscellaneous Statements

Premium

20.500.12592/kqk9n9

Report on the Proposed Indus Right Bank Canal Project with Abstract Estimates and Miscellaneous Statements

1909

Thus the lines surveyed were for (1) the main canal running tovds the west of the railway and taiing into the Dunster wah and subsequently into the river through the Aralwah (2) Shalidadpur branch carrying water to the western tracts beyond the valley bottom (3) the Ratodero Branch (4) the Ghar canal with cross sections (6) a new cut from the Ghar called the Kambar minor (6) Mirwah minor als [...] Allowing a margin of.6' below the top of the gate the full supply level for the main canal is taken at 191.40 on the river side of the regulator that at the canal side being 190.90 the difference :5 feet being necessary to maintain the requisite velocity of flow through the regulator. [...] 1 (Ghar) to the east of the main canal after it leaves the main canal; and the regulator provided at the head of this Dokri branch tends to keep a pool of water in the Ghar Cananear Larkana to keep the old remembrances of the hoary Ghar even after the Indus Right Bank Cana'e.14. [...] This starts from the upper portion of the fall on the.main canal from the same point as the Johi branch and runs to the east of the railway as shown so us to command the higher lands near the river properly. [...] Earth work typical sectfoits has been fixed by accurate calculations (attached) so as to secure r. minimum cost for the whole section: the cost evdently depends on the depth of cutting the height of the spoil bank the width of land occupied by the spoil bank and the rate of cutting and conveyance of earth as well as the compensation for land.
agriculture environment
Pages
249
Published in
India
SARF Document ID
sarf.146573
Segment Pages Author Actions
Frontmatter
i-x unknown view
Indus Right Bank Canal Project-1909 Report
1-36 unknown view
Indus Right Bank Canal Project 1909 Miscellaneous Statements
37-130 unknown view
Indus Right Bank Canal Project 1909 Abstract Estimates
131-220 unknown view
Indus Right Bank Canal Project 1909 Financial Statements
i-234 unknown view

Related Topics

All