cover image: Schedule of Rates and Standard Specification

Premium

20.500.12592/7tjdtb

Schedule of Rates and Standard Specification

1939

The materials stocked in the Corparation Stores of which a list must be attached to the tender form will be issued to the contractor at the prices noted in the list on the indent of the Officer in-charge; the contractor shall have to take delivery of all the indented materials from the Corporation Stores and his tender rates for all items of works involving use of Corporation suplies are to [...] In case the period of suspension exceeds three months the Chief Engineer may at his discretion allow an increased or reduced rate to the contractor for any item which in the opinion of the Chief Engineer has been materially affected by the rise or fall of the market.4 The Corporation shall not be liable for any loss or damage to the cotrctor in case of any delay on the part of the Corporatio [...] Setting out work.—The contractor shall be responsible for the accuracy of the position levels and dimensions of the work according to the drawings or instruction given to him by the Chief Engineer or his represetative and if at any time during the progress of the work any error appears the contractor shall amend the work to the satisfaction of the Chief Engneer free of cost to the Corporati [...] Plants and materials to be the property of tie Corporation.—All works and materials trought and left upon the ground by the Contractors or by their order for the purposes of forming part of the works shall be considered to be the property of the Corporation when payment shall have been made of the amount of any certificate of the Engineer in which the value thereof shall be included and in such c [...] Payment.—Payment will be made to the Contractor from time to time during progress of the work at the rate of 90 per cent upon the value of the works actually executed as certified by the Chief Engineer; the rmaining 10 per cent shall be retained by the Corporation till after the copletion of the work when one-half of the money so retained will be paid alone with the final bill tor the wor
urban studies
Pages
190
Published in
India
SARF Document ID
sarf.141099
Segment Pages Author Actions
Preface
i-iii unknown view
Standard Specification
1-68 B. N. Dey view
Schedule of Rates
69-187 N.G Bose, B. N. Dey view

Related Topics

All